DIGITAL TWIN PIPELINE // MULTI-AGENT GATEWAY

Facility Twin Compiler & Multi-Agent Portal

Drop in long-form industrial plant specifications (BESS, Substation, Data Center) and compile a 7-layer OT Cyber Digital Twin backed by Valyu deep research, strict protocol separation, and procedural 3D conduit routing.

Open Fullscreen Twin

Facility Intake & Folder Drop-in

Drop in long-form Markdown, CAD schedules, single-lines, and ICD manifests or select a verified campus blueprint.

OT COMPILER ENGINE // v2.6
Drag & drop facility folder here, or browse disk

Supports SCOPE.md, HLD.md, ICD pinout tables, P&ID manifests, single-line schedules (.md, .json, .csv)

Available Campus Blueprints
Maasvlakte 100MW/400MWh BESS & 150kV Substation
Battery Energy Storage System
Port of Rotterdam, NLResearch Grounded (pgvector)
SCOPE.mdHLD.mdICD.mdDLD.mdP&ID_01.svg
Hyperscale AI Data Center Campus (50MW)
Tier IV AI Data Center
Amsterdam Region, NLCompiled 3D GLB (14MB)
facility-graph.jsonroutes.jsonhazard-log.jsonicd-graph.json

Automated Facility Compiler Pipeline

STAGE 3 OF 7
📁✓ DONE
1. Intake & Parse
Markdown / Single-Lines
⚡✓ DONE
2. Valyu Research
Multi-Agent ReAct
🛡️ACTIVE
3. Asset Gate
Purdue & Protocol Check
📐04
4. Conduit Solver
Dijkstra Strata & Fillets
🔍05
5. Conduit Gate
Fill & Separation Check
🧊06
6. Blender Build
PBR & Draco Compression
🚀07
7. Live Twin
pgvector & 3D Viewer
Target Facility: bess-rotterdam-01

OT Checkpoint & Verification Gates(bess-rotterdam-01)

Formal human-in-the-loop review of equipment manifests, protocol boundaries, and conduit routing before 3D model emission.

Mesh ID (Binding Key)LabelPurdue LevelSecurity ZoneCSET ComponentRating / SpecsStatusAction
PWR_bess_rack_01LFP Battery Enclosure Skid 01Level 1Zone-BESS-Aicon-battery1.25 MW / 5.0 MWh✓ Verified
PWR_pcs_inv_01Central PCS Inverter Skid 01Level 1Zone-Inverter-Yardicon-inverter5.0 MW, 0.69kV/33kV✓ Verified
PWR_gis_150kv150kV Gas Insulated SwitchgearLevel 0-1Zone-Substation-Yardicon-switchgear150kV, 31.5kA, SF6/Air✓ Verified
SAF_facp_masterMaster Fire Alarm Control PanelLevel 1 (SIS)Zone-Safety-SISicon-fire-panelSIL-3 Dry Contact Loop✓ Verified
CTL_ppc_emsPower Plant Controller / EMSLevel 3Zone-Supervisoryicon-controllerTenneT Grid Code Compliant✓ Verified
NET_rtu_540Substation Gateway RTU 540Level 2Zone-Substation-Controlicon-rtuIEC 61850 / DNP3 Outstation✓ Verified
0 danglers detected • All assets rest mathematically on y = 0 plane

This Site Uses No Cookies

Eigenia does not set cookies. The only thing stored in your browser is one preference, saved in local storage, noting that you have seen this notice.