DIGITAL TWIN PIPELINE // MULTI-AGENT GATEWAY
Facility Twin Compiler & Multi-Agent Portal
Drop in long-form industrial plant specifications (BESS, Substation, Data Center) and compile a 7-layer OT Cyber Digital Twin backed by Valyu deep research, strict protocol separation, and procedural 3D conduit routing.
Facility Intake & Folder Drop-in
Drop in long-form Markdown, CAD schedules, single-lines, and ICD manifests or select a verified campus blueprint.
Drag & drop facility folder here, or browse disk
Supports SCOPE.md, HLD.md, ICD pinout tables, P&ID manifests, single-line schedules (.md, .json, .csv)
Available Campus Blueprints
Maasvlakte 100MW/400MWh BESS & 150kV Substation
Battery Energy Storage SystemPort of Rotterdam, NLResearch Grounded (pgvector)
SCOPE.mdHLD.mdICD.mdDLD.mdP&ID_01.svg
Hyperscale AI Data Center Campus (50MW)
Tier IV AI Data CenterAmsterdam Region, NLCompiled 3D GLB (14MB)
facility-graph.jsonroutes.jsonhazard-log.jsonicd-graph.json
Automated Facility Compiler Pipeline
STAGE 3 OF 7📁✓ DONE
1. Intake & Parse
Markdown / Single-Lines
⚡✓ DONE
2. Valyu Research
Multi-Agent ReAct
🛡️ACTIVE
3. Asset Gate
Purdue & Protocol Check
📐04
4. Conduit Solver
Dijkstra Strata & Fillets
🔍05
5. Conduit Gate
Fill & Separation Check
🧊06
6. Blender Build
PBR & Draco Compression
🚀07
7. Live Twin
pgvector & 3D Viewer
Target Facility: bess-rotterdam-01
OT Checkpoint & Verification Gates(bess-rotterdam-01)
Formal human-in-the-loop review of equipment manifests, protocol boundaries, and conduit routing before 3D model emission.
| Mesh ID (Binding Key) | Label | Purdue Level | Security Zone | CSET Component | Rating / Specs | Status | Action |
|---|---|---|---|---|---|---|---|
| PWR_bess_rack_01 | LFP Battery Enclosure Skid 01 | Level 1 | Zone-BESS-A | icon-battery | 1.25 MW / 5.0 MWh | ✓ Verified | |
| PWR_pcs_inv_01 | Central PCS Inverter Skid 01 | Level 1 | Zone-Inverter-Yard | icon-inverter | 5.0 MW, 0.69kV/33kV | ✓ Verified | |
| PWR_gis_150kv | 150kV Gas Insulated Switchgear | Level 0-1 | Zone-Substation-Yard | icon-switchgear | 150kV, 31.5kA, SF6/Air | ✓ Verified | |
| SAF_facp_master | Master Fire Alarm Control Panel | Level 1 (SIS) | Zone-Safety-SIS | icon-fire-panel | SIL-3 Dry Contact Loop | ✓ Verified | |
| CTL_ppc_ems | Power Plant Controller / EMS | Level 3 | Zone-Supervisory | icon-controller | TenneT Grid Code Compliant | ✓ Verified | |
| NET_rtu_540 | Substation Gateway RTU 540 | Level 2 | Zone-Substation-Control | icon-rtu | IEC 61850 / DNP3 Outstation | ✓ Verified |
0 danglers detected • All assets rest mathematically on