Machinery Regulation takes effect 11 months before CRA full application, requiring cyber resilience for CE marking.
Industrial controllers and firewalls are Annex IV Class II PDE, requiring third-party Notified Body certification.
IEC 62443-4-1 (SDL) and 62443-4-2 (Technical Requirements) satisfy over 80% of CRA Annex I technical mandates.
Third-party compiled RTOS binaries must be decomposed into machine-readable CycloneDX SBOMs.
Harmonizing IEC 62443 with CRA Annex I and Machinery Safety
The Dual Regulatory Mandate for Industrial Equipment
Industrial automation device builders face a critical timeline. Machinery Regulation (EU) 2023/1230 becomes mandatory on January 20, 2027. Annex III Section 1.1.9 explicitly requires machine hardware and software connections to withstand external cyber corruption.
Eleven months later, in December 2027, the Cyber Resilience Act mandates full security by design, 10-year technical files, and continuous vulnerability reporting for all connected industrial equipment.