One accountable engineer on the owner's side, across designers, integrators and contractors.
Technical authority
Case study
A new underground rail line produces documents faster than anyone can read them. The twin read them: more than 4,000 engineering documents, from low-level designs and interface control documents to safety and reliability cases, minimum operating requirements, hazard and risk registers, audits, test results, threat and vulnerability assessments, security-related application conditions, handover documentation and training.
Each became a connected record of the system rather than a file in a folder, and operations used the same model to run what-if scenarios on investment decisions.
Every engagement starts from the facility's country, sector, type, supply chain and external pressures. The researched record for the country, and the origins of its parts and software, set what the work has to cover.
Send the country, the sector and the facility type. The enquiry form carries the service with it.
Eigenia does not set cookies. The only thing stored in your browser is one preference, saved in local storage, noting that you have seen this notice.