New build

New construction

Security specified with the design, not added after commissioning.

New build

What you get

  • Security requirements and target security levels written into the specification (IEC 62443-3-3)
  • Zones, conduits and requirements for integrators and suppliers (IEC 62443-2-4 and 62443-4-2)
  • Factory and site acceptance testing of the security functions before handover

Scoped to the facility

Every engagement starts from the facility's country, sector, type, supply chain and external pressures. The researched record for the country, and the origins of its parts and software, set what the work has to cover.

Where this has been done

Public transit
Lead IEC 62443 engineer on New Zealand's City Rail Link · network, wireless, CCTV, building management and physical access for new stations and tunnels
Hyperscale datacenters
Cyber-physical risk models for high-density AI compute halls · the liquid-cooling loops, power trains and thermal limits where a control fault becomes a physical loss · the actuarial case a board can act on

Start with the facility

Send the country, the sector and the facility type. The enquiry form carries the service with it.

This Site Uses No Cookies

Eigenia does not set cookies. The only thing stored in your browser is one preference, saved in local storage, noting that you have seen this notice.